LAVASTER performed assembly works during the construction of a new cooling system for Blast Furnace no. 5 in Kraków at Huta ArcelorMittal Poland. Our scope of works included:

  1. installation of approx. 260 tonnes of steel structure of cooling towers, coolers and fans
  2. assembly of approx. 35 tonnes of steel structure of the roof of the tank no. 6
  3. fabrication, assembly and dismantling of approximately 120 m of piping for etching the coolers before their start-up.